This paper discusses factory and field pressure testing of tubular heat transfer equipment such as closed feedwater heaters, steam surface condensers, and power plant auxiliary heat exchangers built in accordance with Section VIII, Division 1 of the ASME Boiler and Pressure Vessel Code (the ASME Code) and repaired or altered in accordance with the National Board Inspection Code (NBIC) (The ASME issues the ASME Boiler and Pressure Vessel Code at three-year intervals and issues Addenda annually; The National Board Inspection Code (NBIC), 2007 edition (three volumes), ANSI/NBBPVI NB23-2007, The National Board of Boiler and Pressure Vessel Inspectors, Cleveland, OH). It discusses the ASME Code’s and the NBIC’s requirements for hydrostatically testing unfired pressure vessels, which include tubular heat transfer equipment. It shows by analysis that using pressure gauge indications of pressure loss to determine if there is a leak from the tube side to the shell side when the back face of the tubesheet is not visible does not reveal very small leaks or weeping. For the purposes of this paper, we define weeping, , as a leak of 20 drops/h or approximately . During typical half-hour hydrostatic test pressure-holding periods, such weeping would amount to 10 drops of water on the tubesheet face or . Weeping through tube-to-tubesheet joints of high pressure feedwater heaters can lead to wire drawing (wormholing), which can materially reduce the heater life. Leaks from the channel to the shell side of steam surface condensers and auxiliary condensers can introduce brackish water into the condensate. Depending upon the fluid flowing in the tubes, contaminants can enter the shell side of other auxiliary equipment when the channel pressure is higher than that of the shell. This paper concludes that users must advise designers and manufacturers of the hazards of small leaks through the tube-to-tubesheet joints. It recommends that these three entities must agree on suitable leak tests.
Skip Nav Destination
Article navigation
October 2011
Technical Briefs
Pressure Testing Feedwater Heaters and Power Plant Auxiliary Heat Exchangers
Stanley Yokell
Stanley Yokell
Search for other works by this author on:
Stanley Yokell
J. Pressure Vessel Technol. Oct 2011, 133(5): 054502 (5 pages)
Published Online: July 20, 2011
Article history
Received:
May 18, 2010
Revised:
December 3, 2010
Online:
July 20, 2011
Published:
July 20, 2011
Citation
Yokell, S. (July 20, 2011). "Pressure Testing Feedwater Heaters and Power Plant Auxiliary Heat Exchangers." ASME. J. Pressure Vessel Technol. October 2011; 133(5): 054502. https://doi.org/10.1115/1.4003468
Download citation file:
Get Email Alerts
Cited By
Latent Pitfalls in Microstructure-Based Modeling for Thermally Aged 9Cr-1Mo-V Steel (Grade 91)
J. Pressure Vessel Technol
Thermal Stress Analysis of Compact Heat Exchanger Produced by Additive Manufacturing
J. Pressure Vessel Technol
An Improved Model for Predicting Affected Region of Flashing Jet
J. Pressure Vessel Technol
Crack Growth Prediction Based on Uncertain Parameters Using Ensemble Kalman Filter
J. Pressure Vessel Technol
Related Articles
The Application of System CFD to the Design and Optimization of High-Temperature Gas-Cooled Nuclear Power Plants
J. Eng. Gas Turbines Power (May,2008)
Hydrogen Damage to No. 2 Boiler at Armstrong Power Station
J. Eng. Power (July,1964)
Operating Experiences in the Steam and Power Department of the South’s First Alkali Plant
Trans. ASME (October,1937)
Corrosion of Feedwater Heater Tubing Alloys in Peaking Service
J. Eng. Power (July,1965)
Related Proceedings Papers
Related Chapters
Section VIII: Division 2–Alternative Rules
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 2, Sixth Edition
Pressure Testing
Process Piping: The Complete Guide to ASME B31.3, Third Edition
Iwe and Iwl
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 2, Third Edition