Remanufacturing offers the potential for simultaneously recovering the economic value of manufactured components and improving the environment. Some design features make remanufacturing less expensive and/or increase the proportion of components that can be remanufactured. For example, sacrificial components can be used to protect key parts from wear. However, trade-offs are sometimes involved, and product designers need tools to support design for remanufacturing. This paper presents models for estimating the costs and environmental impacts of employing sacrificial components (cylinder liners) in engine blocks. These models are incorporated into a spreadsheet-based design decision tool. Three illustrative examples demonstrate that (1) remanufacturing lowers overall costs when two life cycles are considered, (2) sacrificial cylinder liners should be employed for small (2 L) engines, and their superiority increases with multiple remanufacturing cycles, and (3) for large engines (5.3 L) using cylinder liners is equally preferred to not using them, with respect to both overall cost and environmental impacts.

1.
Lund
,
R.
, 1996,
The Remanufacturing Industry: Hidden Giant
,
Boston University
, Boston, MA.
2.
U.S. Department of Energy Office of Industrial Technologies
, 1998, “
Remanufacturing Vision Statement
,” http://www.remanufacturing.org/vision_statementhttp://www.remanufacturing.org/vision_statement
3.
Production Engine Remanufacturers Association
(PERA), 2000, “
Frequently Asked Questions
,” http://www.pera.org/faqs.htmhttp://www.pera.org/faqs.htm
4.
Hormozi
,
A. M.
, 1999, “
Make it Again
,”
IIE Solutions
, April 1999, http://solutions.iienet.org/issues/499horm.pdfhttp://solutions.iienet.org/issues/499horm.pdf
5.
Amezquita
,
T.
,
Hammond
,
R.
, and
Bras
,
B.
, 1995, “
Characterizing the Remanufacturability of Engineering Systems
,”
1995 DETC
, DE-Vol. 82, Volume
1
,
ASME
, pp.
271
278
.
6.
Mangun
,
D.
, and
Thurston
,
D. L.
, 2002, “
Incorporating Component Reuse, Remanufacture, and Recycle into Product Portfolio Design
,”
IEEE Trans. Eng. Manage.
0018-9391,
49
(
4
), pp.
479
490
.
7.
Nagler
,
B.
, 1999, “
Reintroducing Remanufacturing
,”
Mach. Des.
0024-9114,
71
(
22
), pp.
78
80
.
8.
Jovane
,
F.
,
Alting
,
L.
,
Armilotta
,
A.
,
Eversheim
,
W.
,
Feldmann
,
K.
,
Seliger
,
G.
, and
Roth
,
N.
, 1993, “
A Key Issue in Product Life Cycle: Disassembly
,”
CIRP Ann.
0007-8506,
42
(
2
), pp.
651
658
.
9.
Shu
,
L.
, and
Flowers
,
W.
, 1993, “
A Structured Approach to Design for Remanufacture
,”
Intelligent Concurrent Design: Fundamentals, Methodology, Modeling and Practice
,
ASME
66
.
10.
AERA–Engine Rebuilder Association
, 1998, “
Standards of Service for Diesel Engines
,” http://www.aera.org/Library/diesel_standards_of_service.htmhttp://www.aera.org/Library/diesel_standards_of_service.htm
11.
Mabee
,
D. G.
,
Bommer
,
M.
, and
Keat
,
W. D.
, 1999, “
Design Charts for Remanufacturing Assessment
,”
SME J. Manuf. Sys.
,
18
(
5
), pp.
358
366
.
12.
Hammond
,
R.
,
Amezquita
,
T.
, and
Bras
,
B.
, 1998, “
Issues in the Automotive Parts Remanufacturing Industry–A Discussion of Results from Surveys Performed among Remanufacturers
,”
Int. J. Engi. Des. Autom.
,
4
(
1
), pp.
27
46
.
13.
Sherwood
,
M.
, and
Shu
,
L. H.
, 2000, “
Modified FMEA using Analysis of Automotive Remanufacturer Waste Streams to Support Design for Remanufacture
,”
Proc. ASME 2000 DETC, Computers and Information in Engineering Conference
, pp.
1
10
.
14.
Williams
,
J.
, and
Shu
,
L.
, submitted by Fenton, R. G., 2001, “
Analysis of Remanufacturer Waste Streams Across Product Sectors
.” STC Dn, 50/1/2001,
CIRP Ann.
0007-8506, pp.
101
104
.
15.
Schrader
,
T. R.
, and
Bawel
,
D. A.
, 1984, “
Specification Criteria for Remanufacturing
.”
SAE Tech. Pap. Ser.
0148-7191 No. 840794.
16.
Hauser
,
J.
, and
Clausing
,
D.
, 1988, “
The House of Quality
,”
Harvard Bus. Rev.
0017-8012 May-June
1988
, pp.
63
73
.
17.
Krill
,
M.
, 2001 “
A Decision Tool for Sacrificial Engine Components in Design for Remanufacture
,” Thesis, University of Illinois at Urbana-Champaign and Technical University Darmstadt.
18.
Shu
,
L. H.
, and
Flowers
,
W. C.
, 1999, “
Application of a Design-for-Remanufacture Framework to the Selection of Product Life-Cycle Fastening and Joining Methods
,”
Rob. Comput.-Integr. Manufact.
0736-5845,
15
, pp.
179
190
.
20.
Cole
,
D. E.
, 1999, “
Delphi IX Forecast and Analysis of the North American Auto Industry; A Comprehensive Benchmark through 2007
,” Office for the Study of Automotive Transportation, Univ. of Michigan, Ann Arbor.
21.
Overby
,
C.
, 1980, “
Product Recycling (Remanufacturing) as a Conservation Option: An International Dimension
,”
Advances in Materials Technology in the Americas
, Vol.
1
,
Materials Recovery and Utilization
, pp.
113
119
.
22.
D’Amore
,
R. A.
, 1984, “
Product Integrity in a Remanufacturing Operation
,”
SAE Tech. Pap. Ser.
0148-7191 No. 840795.
23.
Holzwasser
,
H. A.
, 1983, “
Engineering for Remanufacturing
,”
SAE Tech. Pap. Ser.
0148-7191 No. 830549.
24.
Kulkarni
,
U. A.
, and
Bao
,
H. P.
, 2003, “
Close-Loop Cost Equation for Objects Manufactured by Milling
,”
ASME J. Manuf. Sci. Eng.
1087-1357,
125
(
3
), pp.
436
448
.
25.
Bidanda
,
B.
,
Kadidal
,
M.
, and
Billo
,
R. E.
, 1998, “
Development of an Intelligent Castability and Cost Estimation System
,”
Int. J. Prod. Res.
0020-7543,
36
(
2
), pp.
547
568
.
26.
Nicolaou
,
P.
,
Thurston
,
D.
, and
Carnahan
,
J.
, 2002, “
Machining Quality and Cost: Estimation and Tradeoffs
,”
ASME J. Manuf. Sci. Eng.
1087-1357,
124
(
4
), pp.
840
851
.
27.
Chelsea Center for Recycling and Economic Development
, 1999, “Technical Report No. 8,”
University of Massachusetts
, http://www.chelseacenter.org/pdfs/TechReport8.pdfhttp://www.chelseacenter.org/pdfs/TechReport8.pdf
28.
Integrated Waste Management Board
, 2001, “
1995 to 2000 Summaries of Solid Waste Tipping Fees Surveys
,” http://www.ciwmb.ca.gov/Landfills/TipFees/TPSums.htmhttp://www.ciwmb.ca.gov/Landfills/TipFees/TPSums.htm
29.
American Metal Market
, 2001, “
Prices for recycling materials
,” http://www.amm.comhttp://www.amm.com
30.
31.
PRé Consultants
B. V.
, 1997,
SimaPro–Database and User Manual
,
Amersfoort
, Netherlands.
32.
Keeney
,
R.
, and
Raiffa
,
H.
, 1993,
Decisions with Multiple Objectives
,
Cambridge University Press
, Cambridge, UK.
33.
Thurston
,
D. L.
, 1991, “
A Formal Method for Subjective Design Evaluation with Multiple Attributes
,”
Res. Eng. Des.
0934-9839,
3
, pp.
105
122
.
34.
Thurston
,
D. L.
,
Carnahan
,
J. V.
, and
Liu
,
T.
, 1994, “
Optimization of Design Utility
,”
ASME J. Mech. Des.
1050-0472,
116
(
3
), pp.
801
808
.
35.
Thurston
,
D. L.
, 2001, “
Real and Misconceived Limitations to Decision Based Design with Utility Analysis
,”
ASME J. Mech. Des.
1050-0472,
123
(
2
), pp.
176
182
.
You do not currently have access to this content.