One of the most significant contributors to the overall uncertainty of a performance test of a combined cycle steam turbine is the uncertainty of the primary flow measurement. ASME performance test codes provide many alternative methods for determining flow. In two actual combined cycle tests performed in 2005, the following three alternate methods were used to determine the high-pressure (HP) steam flow into the combined cycle steam turbines: (1) Derivation from measured HP feedwater flow using calibrated PTC 6 throat tap nozzles, (2) derivation from low-pressure (LP) condensate using calibrated PTC 6 throat tap nozzles, and (3) derivation from LP condensate using calibrated orifice metering sections. This paper describes the design, calibration, and installation of each flow meter involved, the methods used to calculate the HP steam flow, the estimated uncertainty of the HP steam flow derived using each method, and the actual test results using each method. A comparison of the methods showed that there are distinct advantages with one of the methods and that very low uncertainties in HP steam flow can be achieved if sufficient attention is applied to the design, calibration, and installation of all flow meters involved. Note that the information in this paper was originally published in ASME Paper PWR2006-88074 and presented at the 2006 ASME Power Conference in Atlanta, GA. For detailed diagrams, figures, and tabulations of data and analysis, please refer to the published proceedings from that conference.
Skip Nav Destination
e-mail: wlccampb@southernco.com
e-mail: whhopson@southernco.com
e-mail: maasmith@southernco.com
Article navigation
November 2008
Research Papers
Comparison of Primary Flow Measurement Techniques Used During Combined Cycle Tests
W. Cary Campbell,
e-mail: wlccampb@southernco.com
W. Cary Campbell
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242
Search for other works by this author on:
Warren H. Hopson,
e-mail: whhopson@southernco.com
Warren H. Hopson
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242
Search for other works by this author on:
Mark A. Smith
e-mail: maasmith@southernco.com
Mark A. Smith
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242
Search for other works by this author on:
W. Cary Campbell
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242e-mail: wlccampb@southernco.com
Warren H. Hopson
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242e-mail: whhopson@southernco.com
Mark A. Smith
Southern Company Services
, 42 Inverness Center Parkway, Birmingham, AL 35242e-mail: maasmith@southernco.com
J. Eng. Gas Turbines Power. Nov 2008, 130(6): 063001 (7 pages)
Published Online: August 26, 2008
Article history
Received:
October 12, 2006
Revised:
January 2, 2007
Published:
August 26, 2008
Citation
Campbell, W. C., Hopson, W. H., and Smith, M. A. (August 26, 2008). "Comparison of Primary Flow Measurement Techniques Used During Combined Cycle Tests." ASME. J. Eng. Gas Turbines Power. November 2008; 130(6): 063001. https://doi.org/10.1115/1.2720544
Download citation file:
57
Views
Get Email Alerts
Cited By
On Leakage Flows In A Liquid Hydrogen Multi-Stage Pump for Aircraft Engine Applications
J. Eng. Gas Turbines Power
A Computational Study of Temperature Driven Low Engine Order Forced Response In High Pressure Turbines
J. Eng. Gas Turbines Power
The Role of the Working Fluid and Non-Ideal Thermodynamic Effects on Performance of Gas Lubricated Bearings
J. Eng. Gas Turbines Power
Tool wear prediction in broaching based on tool geometry
J. Eng. Gas Turbines Power
Related Articles
Extrapolation and Curve-Fitting of Calibration Data for Differential Pressure Flow Meters
J. Eng. Gas Turbines Power (February,2010)
ASME Research on High Pressure-High Temperature Steam and Water Flow Measurement: Report of Subcommittee 7 of the ASME Fluid Meters Research Committee
J. Basic Eng (December,1965)
Simulation of Producer Gas Fired Power Plants with Inlet Fog Cooling and Steam Injection
J. Eng. Gas Turbines Power (July,2007)
Problems in Measuring Steam Flow at 1250 Psia and 950 F With Nozzles and Orifices
Trans. ASME (July,1958)
Related Chapters
Lay-Up and Start-Up Practices
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Sampling
Consensus on Operating Practices for the Sampling and Monitoring of Feedwater and Boiler Water Chemistry in Modern Industrial Boilers (CRTD-81)