Abstract

Information is presented concerning the historical background of the vertical impulse-type turbines installed at the Bridge River hydrodevelopment of the British Columbia Electric Railway Company, Ltd. This plant is of wide interest since few similar installations have been made. Data are presented to disclose the reason for selecting the 6-nozzle vertical turbine in comparison with other impulse-type turbines.

This content is only available via PDF.
You do not currently have access to this content.